SERVICES
- Evaluation of Existing Condition
- Probable Maximum Flood and Spillway Adequacy
- Hydrologic Analysis
- Instrumentation and Monitoring Programs
- Geologic and Seismic Reports
- Geotechnical Investigations
- Stability Analysis
- Remediation Plans
- Failure Analysis and Inundation Mapping
- FERC-approved Inspectors (Part 12)
- Preparation of Reports and Other Required Regulatory Documents
- Emergency Action Plan Development
FERC Part 12 SERVICES
- Independent Consultants
- Part 12 Dam Safety Inspections
- Potential Failure Mode Analysis (PFMA) Facilitators
- Core Team Participants
- Supporting Technical Information Document (STID) Preparation
- Performance Monitoring Programs
- Board of Consultants
- Engineering Support Including
- Hydraulic and Hydrologic Analyses
- Dam Break Analyses
- Emergency Action Plans
- Geologic and Seismic Investigations
- Geotechnical and Instrumentation Design and Analysis
- Stability Analyses
- Radial Gate Analyses
- Remedial Design
Project Examples
Jocassee Project FERC Part 12 Safety Inspection
The fourth Five-Year Safety Inspection was required by FERC for the 610 MW
Jocassee Pumped Storage Project for Duke Power. The project includes a
400-foot-high, 1,825-foot-long rockfill-earth core dam, two barrel-gate intakes,
water conveyance tunnels, a gated spillway, two saddle dikes and a powerhouse
with four reversible pump turbines.
Read More...
Vermilion Dam FERC Part 12 Safety Inspection
Devine Tarbell & Associates, Inc.’s (DTA) staff completed the Sixth Five Year
Safety Inspection of Vermilion Dam for Southern California Edison Company (SCE).
The project includes a 165-foot-high, 4,234-foot-long zoned compacted earthfill
dam, an adjacent radial gate service spillway, and an adjacent auxiliary
spillway.